INSPIRATION
Project photos from professionals within the commercial construction and design industry.
Sensata Technologies used Dacon's design-build service to complete their new building within 10 months and under budget.
This project necessitated understanding the value of design on existing conditions and tailoring additions to present buildings.
A historical institution, St. George’s believes athletics acts as an extension of the classroom by reinforcing good sportsmanship, teamwork, self-discipline and responsibility.
Rated as one of the best movers nationwide, Gentle Giant needed an upgraded headquarters to accommodate sales growth yet be within reasonable commuting distance for employees.
Dacon’s primary focus was identifying the greatest sources of utility and product fabrication inefficiencies.
An expanded cooler and forklift battery charger facilitated sales operations. The firm remained completely operational with the project completed in 8 months and $20,000 of savings returned.
The resulting 348,000 SF Gordon Food Service facility entailed 2-story executive offices, a cooler dock, freezer, dry goods storage, 6 pump fuel station, and 45 loading docks. Completion time was only 4 months with $264,000 returned in savings.
As a 25-year-old New England beer distributor, integrity flows in Quality Beverage’s blood. To accommodate corporate development, 3 areas needed to be addressed – a rebranding of the existing office space to enhance corporate culture, the addition of outdoor storage, and a loading station.
Renowned for creating high durability products for demanding environments, an increase in sales necessitated expanding their 50-year location to include additional manufacturing and office facilities.
A 360 FT suspension glass walkway was created between the main campus and style center/gym to facilitate pedestrian traffic. Total project completion was in 10 months.
With Boston-based roots extending back to 1928, MEC has never had a losing year based on the business practices of timeliness, fair price and quality execution. They sought an office design reflective of an accomplished heritage, modern innovation and open collaboration.
A 25,000 SF fit-up was designed for their Chapel View location. The design, consisting of 2 floors, includes an open office work environment, entrance lobby, conference space, training room, restroom, and café.