INSPIRATION
Project photos from professionals within the commercial construction and design industry.
Mid-century modern feel that gives a warm welcome to its guests.
Wells began erection on the podium portion of the Tower in May 2019, in total, we erected and produced more than 1,690 precast concrete members. This work took approximately 301 working days to complete. The architectural solid precast components on the podium and and the tower boast a beautiful s… Read More
Create a unique finish with a continuous line of light. Perfect for drywall ceilings with exposed vertical fasciae, Notch 1’s optional trimless Dado endcap adds texture, depth and detail to the ceiling plane, extruding the hollow architecture to the edge of drywall soffit.
Leckie is a practice rooted in the Cascadia Region — practicing in the margins with a perspective that situates their work regionally and temporally.
Rendering by Leckie Studio
One of 6 main lobby bays. Each bay is a different setting to create the look and feel of a forest hike. They are all different images to portray one walking through the forest. Artwork by Steve Driscoll
In the heart of the Northeast neighborhood, the N&E Apartments capture the spirit of the continuous renaissance of the area.
Awarded ENR California 2020 Best Higher Education project, UCLA Marion Anderson Hall is 64,000 square feet and 4-stories. It features active learning classrooms, auditorium and workspaces, and event and gathering spaces.
Supplied with 78” / 2m black or white power cable and canopy, Illis has a glare cutoff at 50° with UGR