INSPIRATION
Project photos from professionals within the commercial construction and design industry.
The former Steam Plant, built as a power-generating plant in 1907, has undergone a nearly $4 million renovation, which included both state and federal historic tax credits.
The tower openings were fitted with SCW5000 and SCW2500 Series windows, not only providing thermal and energy efficiency, but… Read More
Custom stonework on the exterior of the Tavern Grill located in Roseville, MN, by Axel H. Ohman.
The design was rounded out by a custom art package by a local artist, which included original paintings of several Roanoke landmarks. The result is a youthful and lively space to match the overall feel of The Bridges’ modern architecture, which is breathing new life into this vacated industrial site… Read More
Andersen Bakery & Cafe provides guests with a welcoming atmosphere in San Jose, California, by DERN Architecture + Development.
The exterior of the Calatrava addition at the Milwaukee Art Museum in Wisconsin, by CG Schmidt.
Felber C18 is ready for outdoor use. This lightweight stacking chair from the FelberCollection not only cuts a fine figure on the balcony but is also suitable for the outdoor area of cafes and restaurants.
This private 18-hole Wollaston Country Club in Wollaston, Massachusets underwent an expansion and renovation to provide its members with an inviting new look and improved amenities.
Full design services were completed by GWWO Architects for the beautiful Ocean City Convention Center in Ocean City, Maryland.
This engineering firm renovation consisted of a new workspace and innovation center for the engineering department, by TZS Design Interiors.
In the heart of the business district, Hotel Intercontinental features fine, alfresco dining to stunning views from the 15th-floor outdoor pool, this contemporary gem is perfectly appointed to explore the best New Orleans has to offer. Trapolin-Peer completed a floor-by-floor overhaul or the 484 gue… Read More
ARI worked closely with the Warroad district and Facility Task Force to develop a plan that provided 8 additional classrooms for the early learners, improvements to indoor air quality, technology, building envelope, and student learning spaces.