INSPIRATION
Project photos from professionals within the commercial construction and design industry.
Advanced Masonry Restoration removed and replaced 55,000 lineal feet of sealant and a replacement of 200 damaged brick for Loring Green East Condominiums in Minneapolis, MN.
Henkel Construction Company provided construction management services for a new 106,500 square foot student dormitory and commons building at the NIACC campus in Mason City, Iowa.
Royal Foundry is housed in a 15,000 square foot facility that was transformed into a large cocktail room and distillery as well as a 2,500 square foot barrel room.
Niland Company was awarded the opportunity to supply outdoor lighting to the Hollywood and New York zones of the Universal Studios in Sentosa, Singapore. The Hollywood zone is the main entrance area of the park with the New York zone just past.
Beautiful water features can be found throughout The Summit Outdoor Mall in Birmingham, Mississippi.
Stacked terra-cotta rainscreen paneling gives a sleek exterior design to the South Huntington Ave multi-use building, by NeaCera.
Our Natural Dry finishing process is an unhurried process that takes up to 36 hours. This process forms a layer of protection from the inside which makes our flooring stain resistant as well as scratches and dents less noticeable.
Relax and spend time with family, friends, co-workers and neighbors in the game lounge. Admire the hanging pendant lights and feature ceiling lighting.