INSPIRATION
Project photos from professionals within the commercial construction and design industry.
A great mix of Dutch Quality's Weathered Plank 4 and 6 blends in Winesburg.
Interior view of the award winning Lofts at Mayo Park in Rochester, Minnesota by Snow Kreilich Architects. This project boasts modern design elements and thoughtfully designed amenities.
The residential tower at 17th and Broadway with its concrete facade complements the architectural landscape of the Cathedral Building across the street
Product: Piterak Slim
Color(s): 01 Red; 03 Champagne
Color(s): 01 Red; 03 Champagne
The Clements Subaru dealership in Rochester, Minnesota, features a large curtain wall system, bright signage and a modern facade.
Exterior view of the RDO Truck Center's 1,200 square foot indoor showroom, large enough to display two semi-tractors.
The CUPACLAD® 101 PARALLEL system offers an innovative style based on parallel lines and creates a unique, distinct look to the exterior facade of your building design.
The 15,000 square foot rooftop space, home to an indoor/outdoor bar is available for events year-round and includes panoramic views, a fire pit, shimmering water features, a video wall, and retractable roof.
Williams line of flood lighting products deliver quality illumination to showcase flags, signs, and building facades in a compact, rugged housing designed to withstand harsh outdoor environments.
Design Engineers collaborated closely with the architects at Steven Holl and BNIM and the engineers at TransSolar to integrate the mechanical and electrical systems into the design concept for the University of Iowa School of Art building.
The exterior of the Chase Center in San Francisco, California, features a Custom Woodgrain Panel by Pure + FreeForm.
Photography Credit: Jason O’Rear / Chase Center
Since the location site location was near a lake that could not be disturbed, the team had to come up with an alternative plan to erect the panels, as a result, nearly a quarter of this project was blind set, installation of the precast on north side was had to set over the building with a 400 ton c… Read More