

Cordeck
Kenosha
Brand
Go Back
Back To Projects
MIT Media Lab Expansion | Cambridge, MA
The design of this facility began several years prior to construction start. Although economic considerations required revisions to downsize the project, the value of selecting the In Floor Cellular Raceway System remained.
Cordeck Results
The six story 163,000 square foot building features ar… Read More
Certifications:
The design of this facility began several years prior to the construction start. Although economic considerations required revisions to downsize the project, the value of selecting the In Floor Cellular Raceway System remained.
Cordeck Results
The six story 163,000 square foot building features archit… Read More
Cordeck Results
The six story 163,000 square foot building features archit… Read More