INSPIRATION
Project photos from professionals within the commercial construction and design industry.
BDG Architects worked closely with the Davidoff of Geneva corporate team to design this cigar store and bar in an existing retail space in MetWest International in Tampa, Florida.
Add Profile LED lighting by Fluxwerx to your conference room design.
The welcoming waiting room at the Youth Emergency Services & Shelter, located in Des Moines, Iowa, by Heartland.
Gage Brothers offered design assistance, for this residence hall at the University of Minnesota, in converting the labor intensive cavity wall construction to a solid precast wall with cast in window sills as well as two different thin brick blends. With these budgets, it was determined that the pro… Read More
Sited northwest of the historic 112-year old State Capitol Building,
the Minnesota Senate Building was designed to meet the need for an expansion of the Capitol Campus and, as a 100-year building, to serve the citizens for generations. Its design purposefully facilitates greater interaction and co… Read More
Sited northwest of the historic 112-year old State Capitol Building,
the Minnesota Senate Building was designed to meet the need for an expansion of the Capitol Campus and, as a 100-year building, to serve the citizens for generations. Its design purposefully facilitates greater interaction and co… Read More
Colorado Center Tower 3 is a podium-style office tower with ground level retail, a 6 level garage for 400 cars, and 203,000 ft2 of offices on 8 floors, topped by a roof terrace. This project was completed by Wells Concrete.
The insulated architectural precast concrete structure by Wells Concrete consisted of 83 panels amounting to 29,314 SF with the tallest panels being over 42′-0″ in length due to the varying site elevations. These panels were all cast indoors in a climate-controlled facility in 34 days and were store… Read More
The Center at Lincoln is a 3-story, 77,500 SF, skilled nursing facility located on a 3-acre site. Wells Concrete was involved in this skilled nursing facility from conceptual design through erection, performing on an accelerated schedule of 21 weeks from notice to proceed to erection completion.
Exterior of the wonderfully designed White Bear Subaru in Vadnais Heights, MN by D.J. Kranz as the general contractor
HCM Architects provided the design and build services for the new CPG-ATC project, a Hemi Anechoic Test Facility.